130 MWe Amercoeur coal veteran to be reborn as 420 MWe CCGT


          

刊名:Modern Power Systems
作者:Leonard Sanford
刊号:720C0069
ISSN:0260-7840
出版年:2007
年卷期:2007, vol.27, no.8
页码:15-16
总页数:2
分类号:TK0
语种:eng
文摘:The Amercoeur 1 repowering will provide Electrabel with a flexible mid-merit CCGT at a cost well below that of a green field project. Early in 2009, assuming the current project schedule is met, Electrabel's Amercoeur 1, originally commissioned in 1968 as a coal fired station, and mothballed in 2000, will embark on a new life as a natural gas fired combined cycle plant (CCGT). The installed capacity will increase from 130 MWe to 420 MWe (net), with efficiency rising from 38% to 57%.